3. Landfills capping and uncontrolled waste platforms closing,new landfill execution and a transfer station, collecting system in rural and urban areas, Arges-Romania


The project consists of:
- Landfills capping in Albota (62.000 sqm), Mioveni (40.000 sqm) and Campulung (42.000 sqm).
- Construction of a new landfill waste Albota (75.000 sqm).
- Construction of platforms for waste collection in rural and urban areas located in Arges district.
 
During landfills capping  in these settlements, the main activities are:
-waste relocation
-shaping the landfill waste (taluses, roads, etc.)
-lining the landfill waste
-collecting the surface waters
-leachate collecting system (includes vertical collecting wells, horizontal collecting system and leachate storing basin).
-biogas capturing system (includes vertical collecting wells, horizontal transport system and the biogas capturing installation containing a gas burner).

In Campulung, a building for personnel (including sanitary, thermic and electrical installations), a garage, a recycling building and a compost station are in execution .

During the new landfill execution and old landfill capping, the main activities are:

a. Works executed on the emplacement of the landfill waste (cell 1); lining with geomembrane and geotextile :

-geomembrane: 750.000sqm
-geotextile: 154.000sqm
-drainage layer of gravel: 46.000cm

b. The leachate and residual waters collection system of which:
-obtaining and installing PEHD 100, Dn 355x32,2 pipes (leachate drainage): 2160ml
-loading rooms, inspection wells, pump stations: 10 units

c. Treatment plant for leachate and residual waters

d. Gas extraction system
-vertical wells:13 units
-networks of pipes: 2000ml
-control station: 1 unit
-extraction station: 1 unit
-burner: 1 unit

e. Earthwork for installing the pipes and manholes, also at the storage and composting area.

 
   



 

Construction


Over the 14 years of experience on the Romanian market, the company has put together a dynamic and competent team of specialists that can respond to the highest technical levels.

We execute roads, platforms, parking areas, airport runways, water supply networks and sewerage systems, and civil and industrial ...

Newsletter



 
 
Home|Construction|Special Works|Mechanization|Geosynthetics|Special Materials|Admixtures| Laboratory|Certifications|Works under construction||Careers|Contact