Home|Mission|Certifications|News|Articles|Events|Works under construction||Careers|Newsletter|Contact
Romana English 
 
 
iridex group constructii ISO-9001 ISO-14001 DHSAS-18001 IQNET
 
 
IridexconsConstructionSpecial WorksMechanizationGeosyntheticsSpecial MaterialsAdmixtures Laboratory
 
     
 
 
 
     
Clients

  • SCCF IASI-GRUP COLAS SA-joints execution at Boboc Military Airport runway
  • SC ARGECOM SA-Pitesti-cutting and executing geosyntetic material for Govora river bank
  • SCCF IASI GRUP COLAS SA-slope protection with geocompozites and geocells at Maracineni Bridge
  • SN PETROM Arad-lining residue catch pit
  • SC PETROM SERVICE SA-geomembrane lining of reservoirs and dumps (Braila, Moreni, Berca)
  • SC HIDROCONSTRUCTIA SA-HDPE geomembrane lining-Sighisoara ecological grade platform
  • COMPANIA NATIONALA DE TRANSPORT AL ENERGIEI ELECTRICE TRANSELECTRICA S.A- natural gas network system adaptation from Magheru Bvd
  • SC VALROM INDUSTRIE SRL-lining works of an industrial water basin
  • IRIDEX GROUP IMPORT EXPORT-lining works at Chiajna ecological pit
  • IRIDEX GROUP IMPORT EXPORT-lining works at Costinesti ecological pit
  • SC SYSTEMA ECOLOGIC SA-lining works at Vidra ecological common pit
  • RER SA Buzau - lining works at Buzau city’s ecological pit
  • RAFO SA Onesti-lining works at residue basins
  • SC VIVANI SA-lining works at Slobozia ecological pit
  • SC TERAPIA SA-execution of lining works-closing old waste dump , opening new dump-dangerous waste
  • SC DIEKAT SA-lining works at Piatra Neamt ecological dump
  • INSTITUTUL NATIOANAL DE CERCETARE DEZVOLTARE PENTRU METALE SI RESURSE RADIO-ACTIVE-executing sealed enclosure for Uranium refuse dump-Study Case
  • SC GEOLEX SA-closing refuse dump of mine 25 and slope protection against sliding using geocells
  • PORT CONSTANTA-opening ecological landfill for industrial waste
  • DUCTIL STEEL SA Buzau-ecological landfill for technological mud
  • SC AEROSTAR SA Bacau-geomembrane basins lining for a neutralized station
  • SC SOFERI SA Bacau- collector channels’ lining for a demineralization installation
 
Newsletter



 
 
Home|Construction|Special Works|Mechanization|Geosynthetics|Special Materials|Admixtures| Laboratory|Certifications|Works under construction||Careers|Contact