Landfills for household and industrial waste

Lucrari executate:

  • Landfill execution in Giulesti Sarbi Cells 1, 2, 3, 4, 5, 6 ,
    Total Area: 21.4071m2
    Waste treatement plant 5m3/h , Incinerator
  • Landfill execution and landfill capping - Constantza Seaport .
    Total area of the new landfill: 22.500m2.
    Total area of the old landfill: 90.000m2
  • Landfill capping and construction of a new landfill for hazardous waste SC TERAPIA Cluj-Napoca
    Total Area: 5.000m2
    Quality Trophy – ARACO
  • Landfill constuction Boldesti-Scaieni, Prahova
    Total Area : 50.000 m2
    Waste treatment plant: 3m3/h
  • New Landfill Construction for industrial waste Costinesti, Constanta
    Total Area : 22.000 m2
  • Landfill lining for hazardous waste, ELDAGA Slobozia, Ialomita
    Total Area: 12.200 mp
  • Landfill lining  Vidra
    Total Area: 142.600 m2
  • Landfill lining  for solid waste Cell 1, SC RER Buzau
    Total Area : 32.900 m2
  • Landfill lining  Vivani Salubritate Ialomita
    Total Area : 22.600 m2
  • Household waste landfill in Chiajna-Rudeni, Ilfov County for Iridex Group Import-Export;
  • Placement of the geosynthetic materials for SC Titan SRL;
  • Landfill capping Barzava 

Started works :

  • Landfill Construction Targu Jiu
     Total Area: 33.500 m2
  • New landfill construction Tutura and old landfill capping in Tomesti, Iasi District
      Total Area: old landfill 168.000 sqm ; new landfill – 160.000 sqm
  • New landfill construction in Feteni and old landfill capping in Raureni, Ramnicu Valcea District
    Total Area 163.250 m2
  • Landfills capping, the construction of a new landfill, the construction of a composting and sorting plant - Bacau
    Total Area : old landfills- 145.000 m2; new landfill - 60.000 mp ;
  • Landfills capping, the construction of a new landfill, the construction of waste transfer station and sorting plant – Pitesti, Arges District
    Total Area: Albota new landfill: 75.000 mp; Albota old landfiill: 62.000 mp; Campulung old landill: 42.000 mp; Mioveni old landfill: 40.000 mp
 